The Austin Company completed a comprehensive, 500-page planning and concept development study to survey this building and determine all modifications required to bring the facility up to current technological standards. The results of this study described the scope of improvements required, including preliminary drawings, specifications and cost estimates for work involving all new air handling systems, temperature control systems, domestic and lab service piping systems, steam and chilled water piping systems, laboratory fume hoods, power distribution and emergency power systems, egress lighting and fire alarm systems, lighting systems, exterior glazing and masonry, and all interior finishes. |